How long does it take to customize an aluminum rolling door?
The installation time of a customized aluminum rolling door is a concern for many customers because it is directly related to project progress and cost control. Based on the experience of professional installation companies and industry standards, we can have a general understanding of the installation time of customized aluminum rolling doors.
Installation preparation phase
Before the installation begins, a series of preparations need to be done. This includes measuring the size of the door opening, preparing the required tools and materials, cleaning the installation area, and removing the old door. These preparations usually take half a day to a day
Assembling the rolling door
The rolling door consists of multiple components, including guide rails, load-bearing shafts, door panels, and motors. Depending on the model and specifications of the rolling door, the correct assembly process may take two to four hours, depending on the complexity of the rolling door
Electrical connection
The installation of the rolling door also requires electrical connections, including the correct wiring of the motor, control system, and power supply. This process usually takes one to two hours
Testing and debugging
After the installation is completed, the installer will test and debug the rolling door to ensure the normal operation of the door. This process may take from a few hours to a day, depending on the experience of the installer and the complexity of the door
Training and Delivery
Finally, the installer will provide the user with appropriate training to ensure that they use the rolling door correctly and safely. The training content includes how to operate the switch, how to perform daily maintenance and care, etc. At the same time, the installer will also deliver the necessary documents and certificates to the user. Training and delivery usually takes half a day to a day
Summary
Combining the above stages, the installation of a custom aluminum rolling door usually takes one day to several days. This time frame depends on factors such as the size, complexity and installation conditions of the door. Therefore, customers should take these factors into account when planning the installation to ensure that the project can proceed smoothly.